Month: August 2016

Rio Tinto West Angelas – Lump Stacker Upgrade

X2 Engineering staff were awarded the contract to upgrade the West Angelas Lump Stacker from Proworx NXT (Ladder Logic) to Unity 7.0 (Function Block). All code design was simulated and Factory Acceptance Tested pre-site works to ensure a smooth transition during commissioning. Shutdown works took place over a tight 77 hour window with engineers on day Read More …